
Phosphate reactive chemical barrier and associated monitoring points after reaching final grade. Each of the green irrigation covers contains eight 0.6-centimeter diameter monitoring points in the reactive barrier material.
| Back to Barrier Installation page |
URL:http://ut.water.usgs.gov /fry/in5.html